Fortress Building Products PURE VIEW Instructions D'installation page 16

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 2
Step 2:
Round ATR Line & End
1. Measure the distance from the inside edge of the 2 posts.
2. Cut the ATR to measured length.
3. When test fitting the ATR, place it on top of the spacers.
Do not press the ATR down over the spacers. Removing the
ATR from the spacers can damage the ATR and spacers. As
shown in Fig. 2.
4. Remove the backing of all of the double-sided tape on the
ATR spacers.
5. A Rubber Mallet might need to be used to install. If using a
Rubber Mallet, use a cloth to protect the ATR from damage.
Fig. 1
16
Double Sided
Tape
PURE VIEW: Al
HOME GLASS BALUSTER INSTALLATION
13

Publicité

Table des Matières
loading

Table des Matières