Fortress Building Products PURE VIEW Instructions D'installation page 20

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 1
Fig. 2
ATR Cannot Go
Past This Line
Step 3:
Round ATR Corner
1. When installing ATR on corners with a 2" [51mm] post,
the ATR must be 5/16" [8mm] away from the post.
As shown in Fig. 1.
2. If installing a corner with a 3" [76mm] proud post, install
the ATR at full length from the inside edge of the post to
the inside edge of the post.
Fig. 1
2" Post
[51mm]
5/16"
[8mm]
Minimum
ATR With 2" [51mm] Proud Post /
20
5/16' [8mm]
Minimum
Over The Post
PURE VIEW: Al
HOME GLASS BALUSTER INSTALLATION
13
Fig. 3
ATR Should Not Go Past This
Point When Test Fitting
Fig. 2
3" Post
[76mm]
ATR
ATR With 3" [76mm] Proud Post /
Over The Post
ATR

Publicité

Table des Matières
loading

Table des Matières