Fortress Building Products PURE VIEW Instructions D'installation page 37

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 5
Step 3:
Top Bracket Installation
1. Position support blocks on stairs in line with bottom brackets.
2. Place bottom rail on top of support blocks next to
bottom brackets. Have bottom rail positioned as close to final
installation position as possible.
3. Add two balusters to the bottom rail, add top rail then clamp
panel to post. As shown in Fig. 1.
4. Position top rail brackets parallel with top rail & flat centered
on post. Make sure inside bottom of bracket is flush with
bottom of rail. As shown in Fig. 2.
5. Use pencil to mark top edge of bracket location on post.
6. Dis-assemble the brackets by removing the barrel and screw.
As shown in Fig. 3.
7. Place top rail bracket bases on previous top edge mark.
Center the base on the post and use pencil to add marks for
two screw hole locations. As shown in Fig. 4.
Note:
• For best results, be sure bracket bases are centered on posts
when making marks.
Clamp
Fig. 1
Balusters
Support
Blocks
PURE VIEW: Al
Fig. 6
Fig. 2
Clamp
HOME GLASS BALUSTER INSTALLATION
13
Mark top and
bottom location
of Stair Bracket
on post.
Position where
the rail meets the
back wall of Stair
Bracket Cup.
37

Publicité

Table des Matières
loading

Table des Matières