Fortress Building Products PURE VIEW Instructions D'installation page 30

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ANGLE BRACKET: CUTTING DOWN TOP & BOTTOM RAILS
• Reference pages 11 & 12 for rail cutting steps.
ANGLE BRACKET: BALUSTER INSTALLATION
• Reference Baluster installation instructions on pages 13 - 15.
ANGLE BRACKET: ROUND & FLAT ACCENT TOP RAIL (ATR)
• Reference page 15-18 for Proud Post ATR steps.
• Reference page 18-22 for OTP ATR steps.
ANGLE BRACKET: ROUND & FLAT ATR MITER SPLICE
Step 1:
ATR Angle Splice (Proud Post)
1. Use 3/32" [2.5mm] hex wrench to tighten set screw
and lock Angle Bracket at 45
As shown in Fig. 1, 2.
2. Place Angle Splice on top of ATR butting up the end
face of the splice to the face of the 3" [76mm] post.
As shown in Fig 3, 4.
3. A Rubber Mallet might need to be used to install. If using a
Rubber Mallet, use a cloth to protect the ATR from damage.
4. Secure Angle Splice with two #6-20 x 1/2" [12.5mm]
self-drilling screws.
Note:
• Angle Splice only works if brackets are angled at the
45
degree setting.
o
30
PURE VIEW: Al
HOME GLASS BALUSTER INSTALLATION
13
degree position.
o

Publicité

Table des Matières
loading

Table des Matières