Fortress Building Products PURE VIEW Instructions D'installation page 42

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 1
Step 3:
Install Balusters Into Bottom Rail
1. Carefully slip Baluster sheet vertically into each slot of the
bottom rail. As shown in Fig. 1.
Tip:
• Be sure to wear safety gloves and goggles when handling
Glass.
Fig. 1
Step 4:
Install Top Rail
1. Carefully slip Top Rail over the top of the Balusters into the
top Bracket Cups.
2. A Rubber Mallet might be needed to complete installation.
If using a Rubber Mallet, use a cloth to protect the Top Rail
Cap and Top Rail Cap Spacer from damage.
3. Pre-drill Bracket Cup holes for screws using a 3/16"
[89.5mm] drill bit.
4. Secure top rail to Bracket Cups with provided T-25 Drive
Thread-Cutting Screws. Use low speed setting on drill.
42
PURE VIEW: Al
HOME GLASS BALUSTER INSTALLATION
13
Fig. 2

Publicité

Table des Matières
loading

Table des Matières