Fortress Building Products PURE VIEW Instructions D'installation page 36

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 2:
Bottom Bracket Installation Continued
1. Use Spring Punch to mark the holes. As shown in Fig. 1.
2. Drill out bracket holes with a 3/16" drill bit.
As shown in Fig. 2.
3. Use scrap wood as support and drill through center holes in
bracket base. As shown in Fig. 3.
4. Use T-25 screws to attach the base of the bracket to the
post. Begin with top hole then bottom. As shown in Fig. 4.
5. Keep bracket base centered as you install second screw.
As shown in Fig. 5.
6. Insert barrel & screw to re-assemble bracket.
7. Tighten barrel & screw. As shown in Fig. 6.
Note:
• Lower Post may need to be unmounted to install bracket
then remounted.
Fig. 1
Fig. 3
36
PURE VIEW: Al
HOME GLASS BALUSTER INSTALLATION
13
Fig. 2
Fig. 4

Publicité

Table des Matières
loading

Table des Matières