EMAK Oleo-Mac OM 92 Manuel D'utilisation Et D'entretien page 33

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 105
INCLUDED CONTENTS
(1) - Lid
(2) - Lifting lever
(3) - Front tube
(4) - Lower tube
(5) - Side struts
(6) - Lower brace
(7) - Handle
(8) - Sack (mesh)
(9) - Frame
(10) - Grass catcher hitches
(11) - Hitch
(12) - Joining material
A part of the grass catcher package are also spare break pins for the cutting
blades (4 pcs).
Keep these pins for future use.
GRASS CATCHER - DESCRIPTION OF THE MAIN PARTS (TERMINOLOGY)
(1) - Lid
(2) - Lifting lever
(3) - Lower tube
(4) - Side struts
(5) - Lower brace
(6) - Handle
(7) - Sack (mesh)
(8) - Front tube
(13) - Grass catcher hitch switch
INSTALLATION OF THE GRASS CATCHER
Screw the grass catcher hinges (10) and the hinge (11) on to the rear plate.
- On some machines, the hinges (10) are already pre-mounted on the rear plate.
- Install the hinge (11) only if a trailer is used.
Attach the front tube to the top holes in the brackets using M5x16 nuts and bolts. Screw
the grass catcher hitch switch on to the left bracket of the frame using two M5x16 bolts
and fasten using nuts.
Screw on the side struts of the grass catcher. The struts are attached to the outer side of
the grass catcher using M5x16 bolts and nuts.
Screw the bottom tube to the front tube and the side struts using M5x3 nuts and bolts. For
easier assembly, we recommend that the grass catcher is turned upside down.
Slide the grass catcher sack on to the frame. Pull the rubber sides of the sack over the
tubes.
33
3.3.2a
3.3.2b
3.3.2c
3.3.2d
3.3.2e
3.3.2f
3.3.2g

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Efco ef 92

Table des Matières