Steam Distribution; Drawing Hot Water; Turning Off The Machine; Pressure Gauge - Bezzera BZ10 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

BEZZERA BZ10
MOD.
the coffee down taking care to not dirty the
edge of the filter holder.
3) Reattach the filter holder in its housing.
4) Start up coffee distribution by pressing the
distribution button (Fig. 04; pos. a).
5) Stop distribution when the desired quantity is
reached, by pressing the distribution button
again.
Warnings:
- Do not remove the filter holder full of coffee when
the machine is working, as it is pressurised.
- Do not touch the metal part of the filter holder
directly as it is hot.
- The standard doses for the filters are 8 grams
for a dose and 16 grams for two doses.

5.4 Steam distribution

1) To avoid liquids being sucked into the boiler,
discharge the steam by turning the tap knob
(Fig. 01; pos. 9).
2) Insert the steam nozzle (Fig. 01; pos. 10) in the
container of the liquid to be heated.
3) Press down and hold the steam tap knob (Fig.
01; pos. 9), lifting the lever the tap will remain
in open position (Fig. 05). The amount of
steam distributed is proportional to the opening
of the tap; the more the tap is opened, the more
steam will be distributed.
4) Once steam has been distributed, release
knob, remove liquid container and clean the
steam nozzle immediately with a damp cloth to
remove heated liquid residues.
Warning:
Do not touch the steam nozzle directly as it is hot.

5.5 Drawing hot water

1) Place the water container under the nozzle (Fig.
01; pos. 8).
2) Press down and hold the water tap knob (Fig.
01; pos. 7) to draw the amount of water
required.
3) Once water has been distributed, release the
knob.
(Fig. 05)
24
Warning:
Do not touch the water distributor tap directly as
it is hot.

5.6 Turning off the machine

Turn the main switch (Fig. 01; pos. 1) to position
"OFF" and check that the green light has turned
off. (Fig. 01; pos. 2)

5.7 Pressure gauge

The machine is equipped with dual scale pres-
sure gauge by which you can check the following
pressures:
Boiler manometer (Fig. 10 - A)
range 0~3 bar (0~0,3 MPa)
The boiler manometer indicates the boiler pres-
sure.
Pressure gauge (Fig. 10 - B)
range 0~15 bar (0~1,5 MPa)
The pressure gauge indicates the pump maximum
pressure during operation. When the motor pump
is stopped the manometer indicates "0".

6 - MAINTENANCE

To allow the machine to work correctly, follow the
maintenance instructions provided below.

6.1 Safety rules

Do not subject the machine to water jets.
Disconnect the machine from the electrical power
by turning the electrical power network omnipolar
knife-switch lever to the resting position 0. Remove
the plug and close the water interception tap
before carrying out maintenance and/or cleaning
work. If the machine is malfunctioning, do not
attempt to repair it alone and call the technical
assistance service immediately. If the electrical
power cable has been damaged, turn off the
machine immediately, turn off the water and call
the technical assistance service. Do not replace
it alone. Carry out cleaning/maintenance when
the machine is cold, preferably wearing protective
gloves.
(Fig. 10)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bz10 s pm

Table des Matières