Machine Installation; Warnings; Preparation Of The Plant For Installation; Connection To The Electrical Power Circuit - Bezzera BZ10 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4 - MACHINE INSTALLATION

4.1 Warnings

Installation must be carried out by qualified staff,
according to the instructions supplied by the
manufacturer and in compliance with applicable
Laws.
The machine should be located and installed
in a place where the use and maintenance are
performed by qualified personnel. Can be used
the machine in places used to staff kitchen areas
in shops, offices and other working enviroments;
farm houses; by clients in hotels, motels and other
residential type enviroments; bed and breakfast
type enviroments
4.2 Preparation of the plant for in-
stallation
Prepare the machine's support on a flat horizontal,
dry, smooth, sturdy, stable surface positioned at
such a height that the cup warming surface is over
150 cm from the ground.
Do not use water jets, neither perform the
installation in places where water jets are used.
In order to guarantee regular operation, the device
must be installed in places where the temperature
is between +5°C and +32ºC and the humidity
does not exceed 70%.
If the machine is exposed to temperatures below +
0°C, proceed as follows:
- ensure that the machine has elapsed 24 hours
in a place where temperature is higher than +
15°C before turn it on.
The machine is powered electrically and needs the
following to function:

- connection to the electrical power circuit

4.2.1 Connection to the electrical
power circuit
Warnings:
- The connection to the mains electricity supply
shall be executed by qualified personnel.
- The system shall be set in compliance with
existing Standards and grounded.
The machine is supplied with power cable
equipped with plug; in the permanent connection
to mains electricity supply, between the machine
and the power mains, interpose a protection
omnipolar switch, with minimum opening between
overvoltage-category III contacts, proportional to
the charge and in compliance with Standards in
force.

5 - MACHINE USE

5.1 First machine start and water
loading in the boiler
Pour water into the tank, checking that the
aspiration pipe touches the bottom (Fig. 03).
Warnings:
- Use drinking water with water hardness in
French degrees of about 15°F; never use hot
water.
Insert the plug in the electrical socket.
Turn the main switch (Fig. 01; pos. 1) to position
ON, green light (Fig. 01; pos. 2) turn ON.
Water is automatically loaded into the boiler.
A safety device will interrupt the motor-
pump after 120 seconds if the maximum
water level is not reached in the boiler.
To restore working mode, turn off and turn on the
machine again.

5.2 Heating

In order for the machine to reach the right
temperature, with the pressure indicated on the
boiler gauge (Fig. 01; pos. 11) between 1 and 1.2
bar (0.1 - 0.12 MPa), open the steam tap (Fig. 01;
pos. 9) and discharge the steam 2 or 3 times into
the discharge basin.
The yellow light (Fig. 01; pos. 3), if turned on
indicates that the machine is working correctly, if
turned off means insufficient water in the tank.

5.3 Preparing coffee

1) Remove the filter holder (Fig. 01; pos. 6) from
the distribution unit (Fig. 01; pos. 5).
2) Load the filter holder with ground coffee, press
23
BEZZERA BZ10
MOD.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bz10 s pm

Table des Matières