Putting Out Of Operation - Abicor Binzel PP Plus 36D Mode D'emploi

Masquer les pouces Voir aussi pour PP Plus 36D:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PP Plus 36D/240D/401D
4.11 2-cycle function of the trigger
1 Press the trigger on the handle and keep it pressed = welding is started.
2 Release the trigger = welding is stopped.
5 Operation
NOTICE
• Hose assemblies containing PVC hoses will start leaking if the return coolant temperature
is exceeded. Make sure not to exceed a return coolant temperature of 60°C.
1 Open the shielding gas cylinder.
2 Switch on the power supply.
3 Set the welding parameters.
4 Start welding.

6 Putting out of operation

NOTICE
• Please make sure that the shutdown procedures for all components mounted in the
welding system are strictly observed before putting out of operation begins.
• Liquid-cooled cable assemblies may start leaking if overheated. This is why the cooling
unit should continue running for approx. 5 min. after welding.
1 Stop welding.
2 Wait until the shielding gas flow has subsided and then switch off the power supply.
3 Close the valve of the shielding gas cylinder.
BAL.0140 • 2018-10-15
5 Operation
EN - 15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pp plus 240dPp plus 401d

Table des Matières