SciCan HYDRIM M2 Mode D'emploi page 38

Masquer les pouces Voir aussi pour HYDRIM M2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4. Installation Instructions
Connecting the water inlet hoses:
Connect the hot and cold water hoses to the hot and
cold water supply. For optional installation with cold and
deionised water supply, connect the cold water hose to
the cold water supply and the hot water hose to the
deionised water supply.
Drain requirements:
Connect the drain hose to the drain outlet. The drain
hose can be attached to existing drain lines using a
3.5 cm or larger standpipe / P-trap combination. If the
hose is connected directly to the drain line, fittings and
adapters should not reduce water flow. The drain hose
should be attached to the main drain at a point no
more than 1 metre above the base of the Hydrim.
A floor drain is acceptable (check local codes).
Electrical Requirements:
Connect the electrical cord to the power supply. The
Hydrim must have a dedicated electrical circuit with a
16A fuse. The outlet must be grounded.
Additional Information:
• The Hydrim unit is heavy. Use a forklift or dolly and
exercise caution when moving it.
• The Hydrim should be serviced on site.
• The Hydrim is equipped with an air gap / anti-suction
device to prevent backflow of dirty water into the water
supply. No other air gap device is necessary.
• If you need to extend the water inlet and drain hoses,
ensure that you use commercial grade plumbing hose.
The maximum length of the drain hose is 3.3 m / 13 ft.
Installing Cleaning Solution:
Install HIP Cleaning Solution as follows:
Installation Test:
Turn on the shut-off valves. Run a cycle, checking for leaks in the plumbing connections.
Testing water hardness and
setting the water softener (salt):
Hydrim is equipped with a built-in water softening
system which needs to be adjusted according to
the local water hardness. The Hydrim water test kit
includes three water hardness test strips in bags. Take
a water sample from the location where the machine
will be installed. Open one of the bags and remove
the test strip. Dip the strip in the water. Compare the
color of the strip with the chart on the back of the bag.
Determine the water hardness according to the chart
on the water test kit envelope. Power the unit on.
Touch the "i" in the lower right hand corner of the
sceen. Select
"Setup" and then
"Set Regeneration".
Using the up and
down arrows, set
the water softener
regeneration level
according to this
table:
consider using an
*
additional water
treatment
If the salt setting is 0, do
not add salt. Otherwise,
unscrew the salt container
lid and pour 1 litre / 1 quart
of water into the water
softener. Add 1 kg / 2.2 lbs
of water softening salt
in the same manner.
Screw the salt container
cap on tightly.
36
Hardness
Hardness –
º
dH
ppm
0 -10
0 - 180
10.5 - 11.8
190 - 210
12.3 - 14
220 - 250
14.6 - 16.8
260 - 300
17.4 - 19.6
310 - 350
20.2 - 22.4
360 - 400
23 - 30.3
410 - 540
30.8 - 49.9
550 - 890*
> 49.9
> 890
salt container
Hydrim
setting
0
1
2
3
4
5
6
7
water
treatment
required

Publicité

Table des Matières
loading

Table des Matières