Sagem ADR 155C Guide D'installation Et D'utilisation page 58

Masquer les pouces Voir aussi pour ADR 155C:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2 - OPERATION
Generation of 15-minute and 24-hour counters:
The result of these calculations is then aggregated for each of the monitoring points in:
!
24-hour counters (BBE, ES, SES and UAS),
!
15-minute counters (BBE, ES, SES and UAS).
The last 6 UNAVAILABLE PERIODS are stored and displayed on HTTP navigator.
The performance process is initialized when the equipment is powered up and the monitoring
point is monitored.
The last 16 non-zero 15-minute counters, the current 15-minute counter, the last non-zero 24-
hour counter, the current 24-hour counter and the last 6 unavailable periods are displayed on
HTTP navigator.
Installation and User Guide - N56717020104
Page A2-20
No reproduction or communication without the written consent of SAGEM SA

Publicité

Chapitres

Table des Matières
loading

Table des Matières