E.P.O. function
Activation
(It makes a
shutdown of
the system)
Terminal strip of two
Remote button or
pins (X50). Normally
switch that has to
closed circuit by
be always opened
means of the cable
in the terminals
as a bridge mode,
(X50).
which is supplied
already connected
between both pins of
the terminal strip (it
allows connecting an
external (EPO) switch
replacing the stated
cable).
Tab. 5. Emergency power off (EPO) operating.
6.7. MANUAL BYPASS SWITCH
(MAINTENANCE).
6.7.1. Operating principle.
The integrated manual bypass in the UPS is a very useful element,
but undue use can have irreversible consequences both for the
UPS or UPSs that make up the parallel system and for the loads
connected to its output. Therefore, it is important to respect the
manoeuvring over the switches as it is described in the following
paragraphs.
6.7.2. Transference to maintenance bypass.
To shift from normal operating to maintenance bypass:
Shutdown the inverter.
For equipments with alphanumerical control panel.
ˆ
Through the keypad of control panel (3) (see Fig. 42) and
from main screen press () key to access to «CONTROL
AND STATUS OF THE UNIT» submenu (screen 1.0), and
then press () key. The screen 1.3 will be displayed,
asking you to shutdown the equipment by pressing (ESC).
Do so, and then validate the operation by pressing (ENT).
See the diagram of Fig. 39.
For equipments with touch screen control panel.
ˆ
Touch over the «Status and control» icon
Touch over the «Start/Stop UPS» icon
The following «Pop up» message will be displayed, It
asks to the end-user if it he is sure about his selec-
Are you sure ?
tion
YES
«YES» .
In parallel systems is necessary to act over one of
them only.
Consider that the UPS or system is still supplying
output voltage through the static bypass.
In parallel systems meanwhile the inverters are
started up, if any manual bypass switch of the UPS or
134
Normal mode is restored.
The equipment has to be
completely shutdown and
deenergized (turn off all the
switches), wait till the DC bus
is discharged (all LEDs and
LCD must be turned off).
If remote button or switch at
terminals (X50), are closed
in the circuit, the equipment
has to be started up again as
section "6.2.2.2. Procedure of
start up" states.
Status & Control
Start / Stop
UPS
. Confirm the action by touching over
NO
switchgear panel board is turned «On» by mistake, the power
supply to the loads will be shifted to the input or bypass mains,
ON CONDITION that the electrical connections of the auxiliary
contacts of the manual bypass have been already done.
Remove the screws (t
of the manual bypass switch, located in the switchgear panel
board and take it out.
Remove the screws (t
of the manual bypass switch (Q5) of the UPS or each UPS and
take it/them out.
Turn the manual bypass switch (Q5) of the UPS or each equip-
ment, to «On» position. Those equipments with touch screen,
it will be shown in the flow diagram of main screen with the
icon
.
Turn the manual bypass switch of the switchgear panel board
to «On» position.
Turn the output switch (Q2) of the UPS or each equipment, to
«Off» position.
Turn the output switch or switches of the switchgear panel
board, to «Off» position.
Turn the battery switch, battery protection or both elements
«Off», considering both available topologies and the estab-
lished order:
ˆ Equipments with a single battery mechanism, either
with a battery fuse holder switch or battery switch
and labelled in the figures of the present document as
(Q3).
ˆ Equipments with two battery mechanisms, fuse holder
switch (F3) and switch (Q3):
Battery fuse holder switch (F3) first.
1.
Next the battery switch (Q3).
2.
In parallel systems, repeat the process in each equipment.
For equipments with external battery cabinets, turn the fuse
holder switch of the battery cabinet/s (Q8) of each UPS to
«Off».
In equipments or systems with separate static bypass SLC
CUBE3+ PS B:
Turn the bypass switch (Q4a) of the UPS or each equipment,
to «Off» position.
Turn the bypass switch or switches of the panel board to «Off»
position.
.
For SLC CUBE3+ PS equipments:
.
Turn the input switch (Q1a) of the UPS or each equipment, to
«Off» position.
Turn the input switch or switches of the panel board to «Off»
position.
The UPS or system is completely shutdown and out of service
(isolated), with the loads supplied from mains directly, through the
manual bypass of the switchgear panel board.
UPS or system with no panel board, the loads are supplied from
mains directly through the manual bypass of the equipments.
Power supply comes from the input line in SLC CUBE3+ PS or
static bypass line in SLC CUBE3+ PS B.
) that fixes the mechanical block (BL)
2
) that fixes the mechanical block (BL)
2