Télécharger Imprimer la page

Salicru SLC CUBE 3+ PS Mode D'emploi page 113

Publicité

Les langues disponibles

Les langues disponibles

5. INSTALLATION.
Read and respect the Safety Information, described in
section 2 of this document. To obviate some of the indi-
cations stated in it, can cause a serious or very serious injuries
to persons in direct contact or in the vicinity, as well as break-
downs in the equipment and/or loads connected to itself.
As well as the own user's manual of the equipment, other
annex documents are supplied in the documentation CD/Pen-
drive. Consult them and follow the described procedure strictly.
Unless the opposite is indicated, any action, indications, prem-
ises, notes and others, are applicable to SLC CUBE3+ PS
equipments, that belong or not to a parallel system.
5.1. RECEPTION OF THE EQUIPMENT.
It is dangerous to handle the equipment over the pallet
with not much prudent, because it could overturn and
cause serious or very serious injuries to the operators due to
impact of the possible fall and/or trapping. Regarding the
equipment handling, moving and location pay attention to sec-
tion 1.2.1. from safety instructions -EK266*08-.
Use the most suitable medium to move the UPS meanwhile is
packaged, with a pallet truck or fork lifting.
Any equipment handling will be done paying attention to the
weights according to the model stated in the technical specifi-
cations of section «9. Annexes».
5.1.1. Reception, packaging and contents.
Reception. To check:
Data in the label sticked in the packaging corresponds
ˆ
to the ones stated in the purchase order. Once the UPS
is unpacked, check the previous data with the one in the
nameplate of the equipment, sticked at the back of the
front door (PF).
If discrepancies exist, make the nonconformity as soon as
ˆ
possible, by quoting the serial number of the equipment
and the references of the delivery note.
No incident has happened during the transport (packaging
ˆ
and impact indicator are in perfect status).
Otherwise, follow the protocol stated in the label at-
tached to the impact indicator, located to the packaging.
Unpacking.
To check the contents the packaging must be removed.
ˆ
Complete the unpacking according to the «Un-
ˆ
packing» procedure of the supplied document to-
gether with this manual and/or attached to the CD/
Pendrive.
Contents.
Standard equipment up to 20 kVA (LV) / 40 kVA (HV): Doc-
ˆ
umentation CD/Pendrive and battery fuses.
USER'S MANUAL
Standard equipment > 20 kVA (LV) / 40 kVA (HV) or type B1:
ˆ
Documentation CD/Pendrive.
Equipment 0 /: Documentation CD/Pendrive, wires and
ˆ
needed supports to fit the batteries in, hardcopy circuit
diagram and battery fuses (equipments up to 20 kVA (LV) /
40 kVA (HV) only).
ˆ Battery cabinet: Fuses and cable connection bundle of
3,5 m. length and suitable cross section.
ˆ If the UPS belongs to a parallel system: A communica-
tion BUS bundle per equipment.
Once the reception is finished, it is advisable to pack the
UPS again till its commissioning in order to protect it against
mechanical impacts, dust, dirt, etc.
The packaging of the equipment has a cardboard pallet or
wooden type depending on the case, expanded polystyrene
corners, bag and polyethylene strip, all of them are recyclable
materials. When it is required to dispose them, do it in accord-
ance to the regulation in force.
It is advisable to keep the packaging for 1 year as minimum.
5.1.2. Storage.
The storage of the equipment, will be done in a dry and cool
place, and protected from rain, dust, water jets or chemical
agents. It is advisable to keep each equipment and battery
set, inside their original packaging because they have been
designed to assure the maximum protection during transport
ant storage.
Data label corresponding to the mod
MUY IMPORTANTE PARA LA VIDA DE LAS BATERÍAS DE Pb-Ca:
su degradación deben ser recargadas en los intervalos indicados. Respetar
el procedimiento referido en el manual de usuario del equipo.
VERY IMPORTANT FOR THE LIFETIME OF Pb-Ca BATTERIES:
their degradation, they must be recharged according to the stated interval
times. Respect the procedure referred in the equipment user's manual.
Fecha carga /
**-**-****
Charging date :
Charging date written down by the factory.
Space to write down the new recharge date.
Fig. 30. Label sticked in the packaging.
In general and less some particular cases,the UPS
has sealed lead-acid batteries. In order to avoid its
deterioration during the storage, they must be recharged in
the stated period of time according to the temperature that
they are exposed (see last charge written down in the label-
ling sticked in the equipment packaging or in the battery
module, see Fig. 29).
SLC CUBE3+ PS UNINTERRUMPTIBLE POWER SOURCE
Para evitar
ºC
Meses /
Months
In order to avoid
0 - 20
12
21 - 30
9
31 - 40
5
41 - 50
2,5
Fecha recarga /
Recharging date:
DY933B00 - 401AF000001
113

Publicité

loading