Télécharger Imprimer la page

Salicru SLC CUBE 3+ PS Mode D'emploi page 127

Publicité

Les langues disponibles

Les langues disponibles

Press the (ENT) key to validate the values, the acoustic alarm
will be stopped.
Press (ESC) to go back to the start of the installation menu to
set them again.
Once they are validated, it will not be possible to set
them again, being necessary the T.S.S. intervention.
Omit the possible wrong rotation alarm triggering that
ˆ
could arise during the procedure over an equipment, be-
cause it will be treated in section 6.2.2.2.
Continue with the described procedure in the next section,
ˆ
considering that the stated actions in the first three steps
are already done.
Fig. 40. Battery configuration label affixed to the equipment.
In equipments with touchscreen, the installation menu
will be displayed by means of 2 screens with all the param-
eters to select. Proceed according to section 1 of the EL064*01
document.
English
7
12
2022
0
February
Monday
Fig. 41. First configuration screen.
If Spanish has been chosen on the language screen, this
will be the default language that will appear on the rest of
the screens. For the rest of the languages, the screen will appear in
English by default until it is changed in the First configuration
screen (Fig. 41).
USER'S MANUAL
Fig. 42. Second HV equipment configuration screen.
In the case of LV equipment, this second screen changes:
Fig. 43. Second LV equipment configuration screen.
6.2.2.2. Daily start up procedure, for equipments
When coming from the previous section the first three steps will be
3x400 V
skipped, because they are already done in the first commissioning.
For the daily start up procedure, starting from equipment/s shut-
down completely, make all the next stated actions:
50 Hz
1
1
36 (18+18)
with alphanumerical display.
Supply input voltage to the switchgear panel board.
Turn «On» the input switch or switches of the panel board,
depending if it is a single equipment or parallel system.
Turn the UPS or each UPS input switch (Q1a) to «On» position.
The LCD of the Control Panel (PC) of each equipment will be
turned on automatically.
For single equipments the LCD panel will display the left mes-
sage of the screen 0.0 and for parallel systems both messages
will be displayed 0.0 :
SLC CUBE 3+
11:19:35 11/09/2013
screen 0.0
Where in parallel systems, the right screen 0.0 corresponds to:
Paral. ---, address of each UPS with three characters, in
ˆ
the example is 002.
Out.SW ---, the position of the output switch of the UPS
ˆ
and/or switchgear panel board, with two status ON and
SLC CUBE3+ PS UNINTERRUMPTIBLE POWER SOURCE
70 Ah
70 Ah
Paral. 002 Out. SW=OFF
11:19:35 11/09/2013
screen 0.0
127

Publicité

loading