Operation - Wacker Neuson G 100 Notice D'emploi

Groupe électrogène mobile
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

G 100 / G 120
4.14

Operation

Switch
Leave the engine start switch (f) in the START/RUN position while the generator is
positions
operating.
If the generator was started using a remote switch, leave the engine start switch in
the REMOTE START position.
R
Let the generator run for a few minutes to warm the engine before closing the main
circuit breaker.
CAUTION
Possibility of unexpected equipment start-up.
Disconnect all attached electrical devices before starting the machine.
Before closing breakers, make sure that any electrical devices attached down-
stream from the generator will not start up unexpectedly.
Before placing the engine start switch in the REMOTE START position, verify
that the contacts on any remote switch linked to the generator set are open.
This will prevent the generator from immediately starting when the engine start
switch is moved to the REMOTE START position.
While the generator is running, check for excessive vibration, oil leaks, or coolant
leaks.
wc_tx001687gb.fm
V
Ø
A
HZ
REMOTE START
REMOTE START
DIAGNOSTICS
DIAGNOSEN
ARRANQUE REMOTO
ARRANQUE REMOTO
DIAGNOSTICOS
DIAGNOSTICS
f
OFF
OFF
AUS
AUS
APAGADO
APAGADO
ARRET
ARRET
START / RUN
START / RUN
FERNSTART
FERNSTART
START / LAUFEN
START / LAUFEN
ARRANQUE / MARCHA
ARRANQUE / MARCHA
DEMARRAGE A
DEMARRAGE A
DEMARRER / MARCHE
DEMARRER / MARCHE
DISTANCE
DISTANCE
47
Operation

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

G 12006206490620650062065106206520620653 ... Afficher tout

Table des Matières