Before Starting

Explanation
Before putting the generator into service, review each item on the following
checklist. Because generators often run unattended for long periods of time, it is
important to make sure that the machine is set up properly to reduce the possibility
of malfunction.
WARNING
Personal injury hazard. Failure to follow the listed procedures may cause injury to
personnel or damage to the generator.
Make sure that all persons setting up the generator are certified or fully trained
on the installation of the generator.
Before starting the generator:
Exterior
check for damage that may have occurred during towing or travel to the jobsite
checks
check for debris that has lodged in vents, near the radiator, or around the fan
make sure the exhaust compartment is clean, with nothing touching the muffler
or exhaust pipes
make sure that the generator is level
chock the trailer wheels
Internal and
check engine oil, coolant, and fuel levels—fill as required
pre-operation
check the fan belt and hoses on the engine for loose connections or fraying—
checks
tighten or replace as required
make sure that the generator is grounded to a good earthen ground per local
regulations and NEC standards
check that all electrical connections were made in compliance with local
regulations and NEC standards
determine voltage needs—set voltage selector switch and make correct
terminal connections
close and secure side panel access doors
review and follow safety instructions found in the front of this Operator's Manual
44
G 100 / G 120
wc_tx001687gb.fm

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

G 12006206490620650062065106206520620653 ... Afficher tout

Table des Matières