Lifting And Transporting; Lifting The Machine; Towing The Machine - Wacker Neuson G 100 Notice D'emploi

Groupe électrogène mobile
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Lifting and Transporting

3
Lifting and Transporting
3.1

Lifting the Machine

Prerequisites
Lifting the generator
3.2

Towing the Machine

Provided equipment
a
c
Prerequisites
Before lifting the generator:
refer to the Technical Data section for the proper operating
weight of the generator
make sure the lifting devices have sufficient capacity to lift the
machine safely
make sure the winch or crane to be used for lifting the machine is
in operable condition and designed for such work
A central lifting eye is located at the top of the generator and is
attached to a lifting frame inside the housing.
When lifting the generator, attach a hook or sling securely to the lifting
eye.
The generator trailer is equipped with brakes, lights, and coupler
connection.
b
Before towing the generator:
Check that the towing vehicle and hitch have a rating equal to or
greater than the GVWR. See Technical Data.
Check the condition of both the coupler and hitch. DO NOT tow
the trailer if the coupler or hitch is damaged.
wc gr005197
30
G 100 / G 120
wc_tx001191gb.fm

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

G 12006206490620650062065106206520620653 ... Afficher tout

Table des Matières