Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Installation and Wiring

3.14.2 LBS Cable Installation

The two connectors of one mesh wire should be plugged into the RJ45 interface of any one UPS of both the Master and Slave
systems. Refer to the following diagram.
Note: Connecting UPS systems in parallel is independent of connecting the UPS systems in LBS mode. LBS does not mean connecting in
parallel.
Parallel 1
Parallel 2
36

Publicité

Table des Matières
loading

Table des Matières