Tripp-Lite SmartOnline S3M Serie Manuel Du Propriétaire page 25

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Installation and Wiring
• When selecting, connecting and routing power cables, follow local electrical codes/regulations.
• If primary loads are non-linear loads, increase the cross-sectional areas of neutral wires 1.5-1.7 times.
• The nominal battery discharge current refers to the current of forty 12V batteries at 240V in standard configuration.
• The maximum battery discharge current refers to the current with forty 12V batteries in standard configuration, that is two
hundred and forty 2V battery cells (1.67V/cell), stop discharging.
• The battery cable specifications are selected based on 20 batteries.
• When the mains input and bypass input share a power source, configure both types of input power cables as mains input
power cables. The cables listed in Table 3.1 are used only when the following requirements are met:
− Routing mode: Routing the cables over the cable ladder or bracket in a single layer
• The length of the AC power cables of a UPS is no longer than 30 m (98 ft.) and DC power cables no longer than 50 m
(164 ft.).
Model
Connector
Mains Input Connector
Bypass Input Connector
Battery Input Connector
S3M25K
S3M30K
Output Connector
Neutral Connector
Grounding Connector
Mains Input Connector
Bypass Input Connector
Battery Input Connector
S3M50K
S3M60K
Output Connector
Neutral Connector
Grounding Connector
Mains Input Connector
Bypass Input Connector
Battery Input Connector
S3M80K
S3M100K
Output Connector
Neutral Connector
Grounding Connector
Connection Mode
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Crimped OT Terminals
Table 3.2: Power Cable Connector Requirements
25
Bolt Type
Bolt Hole Diameter Torque
M8
9mm
M8
9mm
M10
11mm
M8
9mm
M8
9mm
M8
9mm
M10
11mm
M10
11mm
M10
11mm
M10
11mm
M10
11mm
M10
11mm
M10
11mm
M10
11mm
M10
11mm
M10
11mm
M10
11mm
M10
11mm
20N•m
20N•m
26N•m
20N•m
20N•m
20N•m
26N•m
26N•m
26N•m
26N•m
26N•m
26N•m
26N•m
26N•m
26N•m
26N•m
26N•m
26N•m