Connecting The Pneumatic System En; Operation - Abicor Binzel BRS-CC Mode D'emploi

Masquer les pouces Voir aussi pour BRS-CC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BRS-CC
6.10 Connecting the pneumatic system
A compressed-air hose with a min. inner width of
connection plate of the assembly stand by a screw connection (not included). A shut-off valve in the supply
line is recommended. This allows the BRS-CC to be quickly and simply depressurised in order to carry out
any installation and maintenance work.
Fig. 13

7 Operation

NOTE
• As the BRS-CC torch cleaning station is integrated into a welding system, the operating instructions of
1 Switch on the robot control.
2 Start the welding process.
3 Stop the welding process.
Motor
on
off
and
clamping cylinder
loosen clamp
Z2
M
and
LW 6
LW4
Y2
Y1
2
4
14
12
14
5
3
1
Connecting the pneumatic system
the welding components, such as welding torch and robot mount, must be observed during operation.
ø
6mm is required as a supply line. This is fastened to the
Wire cutter
Stroke cylinder
down
open
up
Z1
Z3
S1
LW4
LW4
LW4
Y3
2
2
4
4
14
12
5
3
5
3
1
1
LW6
7 Operation
Injector
on
close
off
LW4
LW6
LW4
LW4
Y4
4
2
12
14
12
5
3
1
EN - 19

Publicité

Table des Matières
loading

Table des Matières