Putting Into Operation - Abicor Binzel BRS-CC Mode D'emploi

Masquer les pouces Voir aussi pour BRS-CC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BRS-CC

6 Putting into operation

Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power supply and close the compressed-air supply.
NOTE
• Please take note of the following instructions:
• The system may only be installed and put into operation by qualified personnel
• Make sure that the cleaning process is not impaired by the collecting tray and the bottle holder.
1
Position 1
2
Clamping position P2
3
Position 3
Fig. 6
DANGER
 2 Safety on page EN-4
(in Germany see TRBS 1203).
1
2
9
8
7
6
4
Position 4
5
Position 5
6
Motor clamp
3
4
7
Lowest position (stroke down)
8
Distance sleeve
9
Gas nozzle
6 Putting into operation
5
EN - 13

Publicité

Table des Matières
loading

Table des Matières