Télécharger Imprimer la page

Installation Of External Battery - LEGRAND KEOR HPE 60 Manuel De Fonctionnement

Publicité

Les langues disponibles

Les langues disponibles

4.6.1.1 Installation of external battery

Do not use internal and external battery together
1
If the battery cabinets not supplied by LEGRAND, it is the installer's
responsibility to check the electrical compatibility and the presence of
appropriate protection devices between the cabinet and KEOR HPE
111
Read the "section Installation" carefully, for assembly procedure of Battery
To avoid risk of electromagnetic interference, separate the battery cables from
Input and Output cables
1
LETHAL VOLATGE of nominal 720 VDC is present when the external battery
connection are made
11
Figure 48 – String configuration 2x30 blocks or 2x31 blocks of 12V VRLA batteries
64
OMW07096 REV. E
Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
Two Serial Strings with central point – Neutral Potential
11

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 80