Télécharger Imprimer la page

LEGRAND KEOR HPE 60 Manuel De Fonctionnement page 78

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
5) On Level no. 1, insert trays no. 1-2-3 in compliance with the position as demonstrated in Picture 31.
NOTES: On trays no. 1 and no. 3 check the circled jumper are not connected,
leave the circled jumper disconnected.
Picture 31 - View fro above Level No.1
6)
Wire level no. 1 as indicated in Picture 32. Leave the circled jumpers disconnected.
Picture 32 - View from above Level No.1 with battery connections
7) On Level no. 2, insert trays no. 4-5-6 in compliance with the position as demonstrated in Picture 33.
OMW07096 REV. E
53

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 80