Télécharger Imprimer la page

LEGRAND KEOR HPE 60 Manuel De Fonctionnement page 82

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
13) On Level no. 5, insert tray no. 13-14-15 in compliance with the position and cabling as
demonstrated in Picture 39.
NOTES: On trays no. 13 and no. 15 check the circled jumper are not connected,
leave the circled jumper disconnected.
Picture 39 - View from above Level No.5
14) Wire the level as indicated in Picture 40. Leave the circled jumpers disconnected.
Picture 40 - View from above Level No.5 with battery connections
OMW07096 REV. E
57

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 80