Télécharger Imprimer la page

LEGRAND KEOR HPE 60 Manuel De Fonctionnement page 66

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
NOTES: If the internal battery are already installed inside the UPS
A) Carry out the operations as indicated in the following label installed
Figure 11 – Warning indications for internal battery
B) Follow the instructions from point 18 to point 23 of this chapter
2) Connect the 3 cables
2A) Connect the 2 cables
3) Connect the 3 cables
3A) Connect the 2 cables
4) Connect the 3 cables
4A) Connect the 2 cables
Picture 11A - Battery terminals
inside the UPS
"+B"
on the battery terminal (180/186 batteries)
"+B"
on the battery terminal (120/124 batteries)
"N"
on the battery neutral terminal (180/186 batteries)
"N"
on the battery terminal (120/124 batteries)
"-B"
on the battery terminal(180/186 batteries)
"-B"
on the battery terminal (120/124 batteries)
OMW07096 REV. E
41

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 80