Electrical Connection; Routeing And Connecting Cable; Alternating Current; Connection Diagram - Assa Abloy effeff 809-12 Notice D'installation Et De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Alternating current

output requires a bridge
rectifier
Pic. 8 :
Connection plan for the
electric security lock 809
tubular frame
EN
52

Electrical connection

Routeing and connecting cable

The connecting cable must be guided in the door leaf from the lock side to the hinge side. Then the cable
must be routed from the door leaf in the door frame.
1
Route the connecting cable in observance of the following notes:
· We recommend routeing the cable within the door leaf in suitable conduit with an inner diameter
of at least 7 mm.
· Do not kink the conduit; ensure that any required bends are as wide as possible.
· In order to avoid damaging the cable, it may only be guided over rounded corners.
· A flexible lead cover, which is mounted fixed in its connection to the door leaf and frame
(„Flexible lead cover", Seite 60), must be mounted for the transition from the door leaf to the frame.
2
Connect the cable according to the connection diagram (Pic. 8) for the electric security lock 809 and
the corresponding connection plans of the superordinate control system.
3
Check whether the following electrical data of the electric security lock 809 and the superordinate
control system match:
· The supply voltage of the electric security lock 809 must match the output power of the controlling device.
· The power consumption of the electric security lock 809 must match the output power of the con-
trolling device.
· The maximum switching capacity of the electric security lock 809 may not be exceeded by the re-
spective circuit to be switched.
· Take into account the voltage loss through the connecting cable so that the electric security lock 809
functions safely.
With activation of the electric security lock 809 by means of an AC voltage output, e.g. with an electric strike
output of an intercom system.
4
Connect a bridge rectifier between the AC voltage output and voltage input.

Connection diagram

+
rd
8
bu
7
ye
4
gn
3
pk
6
pl
10
br
2
gr
5
wt
1
gr-pk
11
bk
9
br-gr
14
wt-gr
13
rd-bu
12
L1
Voltage supply of the coil
All contacts are drawn inactive:
L1
S1
Bolt contact
S2
Outer handle contact
S1
S3
Inner handle contact
S4
Profile cylinder contact
S2
S3
S4
Installation

Publicité

Table des Matières
loading

Table des Matières