Commissioning; Operation; Safety Precautions; Emissions - Astoria Core600 Manuel D'utilisation Et D'entretien

Masquer les pouces Voir aussi pour Core600:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 83
5.

COMMISSIONING

The commissioning of the machine must be per-
formed only by the Maintenance Technician.
6.

OPERATION

Safety precautions

6.1
Carefully read the instructions provided in chapter "I. SAFETY
PRECAUTIONS" on page 43 .

Emissions

6.2
VIBRATIONS
In conditions of use that meet the indications of cor-
rect use provided in this manual, any detected vibrations
do not give rise to dangerous situations.
SOUND EMISSIONS
The noise level emitted by the machine is on average
lower than 70 dB; therefore, there is no obligation to use
personal protective equipment for the auditory system.
If the machine emits unusual noises, the manufacturer
must be notified.
ELECTROMAGNETIC ENVIRONMENT
The machine is designed to work properly in any
industrial electromagnetic environment, falling within
the Emission and Immunity limits provided by current
standards.
56
288
of

Turning the machine on and off

6.3
6.3.1 AL version electric heating
Before starting the machine, make sure that the
level of water in the boiler is
higher than the minimum level
indicated on the water level
window (1).
If there is no water (first in-
stallation or after boiler mainte-
nance), the boiler must be filled
in advance in order to prevent
the heating element from over-
heating.
Proceed as follows:
SWITCH
• Open the water mains tap;
• Using the manual fill, fill the boiler with water until
the optimal level is restored;
• Turn the switch to position "1" and wait
for the machine to warm up completely.
POWER SWITCH
• Open the water mains tap;
• Turn the power switch to position "1" (electricity is
supplied to the pump to automatically fill up the
appliance's boiler and steam boilers) and wait for
the boiler to be automatically filled with
water;
• Turn the main switch to position "2" (full
electrical power supplied, including to
the heating element in the boiler) and
wait for the machine to warm up completely.

6.3.2 Electric heating for the AEP and SAE versions

Press the machine's
power switch (2).
The slow flashing warn-
ing light (3) indicates that
the water is being filled up.
A steady warning light
indicates that the stand-
ard water level has been
reached in the boiler.
0
0
1
3
2
USER manual
1
1
2

Publicité

Table des Matières
loading

Table des Matières