Preliminary Studies; Roof Load Distribution Table; Installation Surface - Tractel Guard trac WP Manuel D'installation, D'emploi Et D'entretien

Garde-corps qui a pour fonction de maîtriser des risques graves de chutes de personnes
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
• Fully equipped long bracket (fig. 5)
W (kg)
L1 (mm)
7
The bracket comes with an anti-slip pad and two
spring-mounted wedges ensuring the clamp-
ing of each barrier in upright position inside the
bracket.
Materials: - cast iron support with cataphoretic
protection
GB
- Pad in EPDM (fig. 5-1)
- Plastic clamping wedge (fig. 5-2)
- Stainless steel wedge spring.
• Fully equipped short bracket (fig. 6)
W (kg)
L1 (mm)
4.5
For correct functioning of the guard trac™ WP or guard trac™ WPS guardrail, and in order to com-
plete the fall prevention safety setup, you must meet the following requirements relating to guardrail
installation surfaces and structures.

6.1. Roof load distribution table

The roof on which the guard trac™ WP or guard trac™ WPS guardrail is installed must be resistant
to support the additional weight of the guardrail as indicated in the load distribution table below:
Description
guard trac™ WP – in-line barrier
guard trac™ WP – free standing end barrier
guard trac™ WPS – in-line and free standing end barriers
Placing the guard trac™ WP or guard trac™ WPS system on a roof structure that has the correct
mechanical characteristics is essential. The load distribution table above provides relevant details. If
there is reason to doubt the underlying roof structure that the guard trac™ WP or guard trac™ WPS
guardrails are being placed on, the advice of a suitably qualified engineer is to be sought.

6.2. Installation surface

Before installing the guard trac™ WP or guard
trac™ WPS guardrail, the installer must ensure
that the installation surface of the flat roof meets
the following requirements:
12
L2 (mm)
H (mm)
752
222
L2 (mm)
H (mm)
525
161

6. Preliminary studies

The bracket comes with an anti-slip pad and a
spring-mounted cone ensuring the clamping of
the barrier in upright position inside the bracket
111
Materials: - Cast iron support with cataphoretic
protection
- Pad in EPDM
- Plastic clamping wedge
- Stainless steel wedge spring.
• Counterweight interface (fig. 8)
W (g)
100
Material: aluminium
111
Figure/
position
10
10
11
• Only one guard trac™ WP or guard trac™
WPS guardrail should be installed per 3 m² of
installation surface.
• The installation area must be greater than
3 m².
L1 (mm)
L2 (mm)
197
25
Surface
Weight
(m²)
(Kg)
0.06
25
0.06
50
0.06
50
H (mm)
60
Pressure
(kPa)
4.2
8.5
8.5

Publicité