Télécharger Imprimer la page

LEGRAND KEOR HPE 200 kVA Manuel De Fonctionnement page 70

Publicité

Les langues disponibles

Les langues disponibles

Picture 17 – Start-up end
5.3
SHUT-DOWN PROCEDURE
1)
Open the switch OCB.
2)
Open the switch BCB.
3)
Open the switch RCB.
4)
Open the switch SBCB.
5.4
SWITCHING PROCEDURE TO MANUAL BYPASS
The load is transferred to Manual Bypass with no interruption of supply to the loads. In this
configuration, the system can be restarted via the return procedure from load on manual bypass,
without the need to de-energize the loads.
Manual bypass
To perform the switching procedure correctly, make sure no alarms are present on
the system.
During Manual Bypass the load is supplied directly by the input mains, therefore
continuous supply cannot be guaranteed to the loads.
1)
Move the Bypass_SW selector to the BYPASS position.
2)
Close the switch MBCB.
3)
Open the switch OCB.
4)
Open the switch BCB.
5)
Open the switch RCB.
6)
Open the switch SBCB.
46
OMP06262 REV. E
Installation and start-up of KEOR HPE UPS 200-250-300 kVA
Installation et démarrage de l'ASI KEOR HPE 200-250-300 kVA
Installazione e avviamento KEOR HPE UPS 200-250-300 kVA

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 300 kvaKeor hpe 80kw960572