Télécharger Imprimer la page

LEGRAND KEOR HPE 200 kVA Manuel De Fonctionnement page 196

Publicité

Les langues disponibles

Les langues disponibles

Picture 21 – Battery capacity setting
5.3.3 Battery test
The BATTERY TEST section allows to carry out a short discharge test of the battery. In case
the battery is not efficient, the alarm "A10 – Battery fault" is generated at the end of the test.
Possible loss of supply
This test can affect the continuity of supply to the loads if the battery is not fully
charged.
5.3.4 New battery
The page NEW BATT is used in case battery circuit breaker BCB is not closed, when
requested, in the start-up phase. In this case the system will start considering the battery
completely discharged and activating the alarm "A10 – BATTERY FAULT".
To set the battery autonomy to 100% it is necessary to access the section and confirm the
operation in the confirmation page.
5.3.5 Resetting the history log
The history log can be reset by entering the RESET HISTORY section; the operation requires a
further confirmation.
Loss of data
The alarms history contains very important data to monitor the device behaviour over
time. We recommend to save the data before deleting it.
UPS user manual
Manuel de l'utilisateur de l'ASI
Utilizzo dell'UPS
OMP06263 REV. D
35

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 300 kvaKeor hpe 80kw960572