Télécharger Imprimer la page

LEGRAND KEOR HPE 200 kVA Manuel De Fonctionnement page 67

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of KEOR HPE UPS 200-250-300 kVA
Installation et démarrage de l'ASI KEOR HPE 200-250-300 kVA
Installazione e avviamento KEOR HPE UPS 200-250-300 kVA
1)
Close the rectifier input switch RCB. After some seconds the touch screen will start and will
show the UPS mimic diagram.
Picture 11 – UPS start-up page
2)
After the software loading phase the control logic will acquire the system status and the
operation of the RCB switch, and will show the operating sequences.
Picture 12 – Rectifier start-up
OMP06262 REV. E
43

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 300 kvaKeor hpe 80kw960572