Télécharger Imprimer la page

Vetus BOWB180 Manuel D'installation page 20

Masquer les pouces Voir aussi pour BOWB180:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
ENGLISH
4
Installation
4.1
Introduction
n
ote
The areas in which the electric motor(s)
of the bow thruster(s) and the batter-
ies are positioned must be dry and well
ventilated.
For overall dimensions see drawing, page
106.
The bow thruster is supplied in parts as
shown.
4.2
Installation tailpiece and intermediate flange
• Ensure that the plastic shim plate (1) has been positioned on the
tail piece.
• Place one packing (2) between the tail piece and the tunnel.
• Apply a sealant (e.g. polyurethane or silicone) between the tail
piece and packing, and between the packing and the tunnel wall.
• Place the tail piece in the hole in the tunnel.
Any extra packings used should be ones capable of justifying the
tail piece.
*) e.g. Sikaflex®-292.
• Grease the hole of the intermediate flange and position this
flange.
• BOWB150 - Dimension 'H' should be 32 - 35 mm (1 1/4" - 1 3/8").
BOWB180/210 - Dimension 'H' should be 65 - 68 mm (2 9/16" - 2
11/16").
• Place an additional gasket between the tunnel tube and the in-
termediate flange if dimension 'H' is smaller than 32 mm for
BOWB150 or smaller than 65 mm for BOWB180/210.
• Check again dimension 'H' .
• Now fit the intermediate flange permanently to the tail piece and
grease the threads of the bolts with 'outboard gear grease' *) be-
fore inserting and tightening them.
Check for possible leaks immediately the ship returns to water.
*) A suitable grease is VETUS 'Shipping Grease' , Art. code: VSG.
20
020809.06
ø 250 mm
n
ote
2
1
Outboard Gear
Grease
Installation manual BOW PRO Series Thrusters: BOWB150 - BOWB180 - BOWB210
M12
19
30 - 35 Nm
(22 - 26 ft.lbf )

Publicité

loading

Ce manuel est également adapté pour:

Bowb150Bow pro b serieBowb210