Krick RoMarin FLB 1 Mode D'emploi page 61

Masquer les pouces Voir aussi pour RoMarin FLB 1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.23
Fig.: Funnel ends
Glue 2 parts 4.18 and 4.19 on each other. Push a piece of brass wire through each of the holes for alignment.
Sand parts 4.18 and 4.19 at an angle along the markings. This makes 6 times B and 2 times A, glue 2 funnel
ends together. Glue a blue light socket 4.23 on top of each of the 2nd holes. Glue the fitting piece 4.20 under
the funnel end.
4.13
4.15
4.14
Fig.: Funnel assembly
Attention the funnels are built in left and right version. The left funnel gets the support for the lamp post 4.21.
Glue the funnels from parts 4.12 - 4.17 together. Make sure that the wall with the two vertical slots is on the
inside. On the left funnel glue parts 4.21 as support for the lamp post. With the help of template 4.22 align the
upper support horizontally.
Status 25. August 2022
4.19
4.18
4.17
4.12
A
B
4.20
4.22
4.21
19
4.23
© Krick Modelltechnik

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ro1091

Table des Matières