Krick RoMarin FLB 1 Mode D'emploi page 55

Masquer les pouces Voir aussi pour RoMarin FLB 1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The next step is to work on the bulwark.
3.5
235 mm
5 mm
Fig.: Trimming bulwark, back deck support
Fig.: Shortening bulwark
Mark and trim the edge of the deep-drawn bulwark 3.5, at the support of the foredeck, with the help of e.g. a
piece of wood 5 mm thick, and mark and trim the cut edge with 5 mm.
Trim 235 mm from the stern side.
Trim the bulwark at the hatched areas of the thermoformed part.
Drill the holes for the portholes 3.11 with D 9 mm, here pre-drill with a thin drill and then best with a conical
reamer e.g. Krick Order No. 492014 or 492013 to the required size. Glue the portholes to the bulwark. These
peel drills prevent the drill from hooking and tearing the thin ABS.
3.5
3.11
Fig.: Bulwark
Fig.: Place bulwark on the hull
Glue the bulwark to the fuselage. Sand the transition between the bulwark and the edge of the hull without a
step.
Status 25. August 2022
13
© Krick Modelltechnik

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ro1091

Table des Matières