Krick RoMarin FLB 1 Mode D'emploi page 46

Masquer les pouces Voir aussi pour RoMarin FLB 1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Drive installation
No.
Description
1.2
Electric motor
1.3
Suppression capacitor
1.4
Suppression capacitor
1.5
Insulating tube
1.6
Connection cable + plug
1.7
Cheese head screw
1.8
Washer
1.9
Motor bulkhead
1.10
Stern tube
1.11
Shaft
1.12
Coupling hose
1.13
Counter nut
Equip motor 1.2 with interference suppression capacitors 1.3, 1.4. When soldering the motor cable 1.6, make
sure that the red cable is soldered to the motor pole with the red dot.
Fig.: Motor with suppression capacitors
Secure the motor to the motor bulkhead 1.9 with screws 1.7 and washers 1.8.
Lightly sand the sterntube 1.10 in the area of the later bonding point.
Connect the propshaft 1.11 with the coupling 1.12 to the motor, push on the stern tube.
The lock nut is only screwed on after installation.
1.2
Fig: Drive
Status 25. August 2022
Ready made
Ready made
Ready made
Ready made
Ready made
Laser part
Brass
Steel
Plastic
Ready made
First: solder the interference suppression capacitors to the
motor so that the two capacitors 103 (value 10 nf) each run
from the terminal lug to the motor housing. Sand the motor
housing very well at the soldering point. Solder the third
capacitor 473 (value 47 nf) between the two terminal lugs.
Insulate the capacitor legs with heat shrink tubing.
1.9
1.12
4
Dimensions
10 nF
47 nF
20 mm
100 mm
M2,5 * 6
D 2,7 * D 6
Laserpl. 1,5
D 4 * 170 mm
D 2 * 215
D 5 * 30
M 2
1.7, 1.8
1.11
Qty
1 n.e.
2 n.e
1 n.e.
4 n.e.
1 n.e.
2
2
1
1
1
1
1
1.13
1.10
© Krick Modelltechnik

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ro1091

Table des Matières