Electric Heating - Astoria GLORIA AL Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 103
P
3.
reparation of the machine
The preparation of the machine and its installation must be carried out by qualified personnel.
i
Use of the machine without all the installation operations having been carried out by technical personnel
could damage it seriously.
T
4.
urning on the machine

4.1 Electric heating

Before starting the machine, make sure that the level of water in the boiler is higher than the minimum level on the
level-check window (1). If there is no water (first installation or after boiler maintenance), it is necessary to fill the boiler
in advance, so as to prevent overheating of the heating element. Proceed as follows :
• Open the water tap of the water mains and of the softener.
• Turn the switch to position "1" (electrical power supplied to the pump for automatic
boiler filling and machine services) and wait for the boiler to be automatically filled with
water;
• Turn the switch to position"2" (full electrical power supplied, including the heating
element in the boiler) and wait for the machine to warm up completely.
during the machine's warm-up phase (roughly 20 minutes), the negative pressure valve will release
steam for a few seconds until the valve itself closes
i
before using the machine, run deliveries dry with the filter holder attached for a few seconds to
release any air which may be in the circuit, so that the delivery groups are completely heated
before using the machine, dispense a few servings of coffee to test the grinding and to check the
operating pressure of the machine
4.2 Gas heating
(if there is a gas system)
• Turn the main switch (A) to position 1;
• open the gas valve (B) on the mains;
• hold down the push button (C) and, at the same time, press the
on button (D). Once the flame ignites, hold down knob (C) for a
few seconds, to allow proper activation of the thermocouple;
• then check through the window (E) that the flame has ignited;
• wait for the operating pressure indicated on the pressure gauge
to reach the working value of 1-1.2 bar;
A
B
0
1
2
E
C
D
13
AL - AEP - SAE

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gloria aepGloria sae

Table des Matières