Remove The Packaging; Check Installation Hardware - GE Monogram ZV30H Instructions D'installation

Masquer les pouces Voir aussi pour Monogram ZV30H:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

REMOVE THE PACKAGING

CAUTION:
sharp edges.
The vent hood is shipped secured to a
shipping board with 4 screws.
• Remove the accessories and Styrofoam
packaging.
• Lift the hood out of the box.
• Remove and properly discard the plastic
wrapping.
• Remove metal grease filters and other
accessories.
• To remove the shipping board, locate and remove
the 4 screws inside the hood on the left and right
sides. Discard the shipping board.

CHECK INSTALLATION HARDWARE

Locate the hardware accessory box packed with
the hood and check contents.
4 Damper assembly
screws (supplied
with damper
assembly)
10 wall/cabinet
screws
658Dia37
6 riser
washers
screws
658Dia9
NOTE: Additional tools, materials and hardware are
required to construct your wall framing support.
Installation Preparation
Wear gloves to protect against
2 metal wall
fasteners
658Dia38
1 plastic
10 flat
grommet
Shipping
board
Shipping
Packaging
screws
Damper
Grease tray
assembly
3 Grease filters
Wall Template
31-10570
7
Shipping screws
Riser
Cabinet Template
31-10571
2 charcoal filters

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Monogram zv30hsrss

Table des Matières