Remove The Packaging; Check Installation Hardware - GE Monogram ZV750 Instructions D'installation

Masquer les pouces Voir aussi pour Monogram ZV750:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

REMOVE THE PACKAGING

CAUTION:
against sharp edges.
The vent hood is shipped secured to a shipping
board with 4 screws.
• Remove the duct cover, parts box and styrofoam
packaging.
• Lift the hood out of the box.
• Remove and properly discard the plastic wrapping.
• Remove metal grease filters and side bar packaging.
Shipping board

CHECK INSTALLATION HARDWARE

Locate the hardware accessory box packed with
the hood and check contents.
10 wood
10 metal wall
screws
fasteners
Duct cover bracket (not required
for recirculating operation)
NOTE: Additional tools, materials and hardware are
required to construct your wall framing support.
Installation Preparation
Wear gloves to protect
Mounting screw
2 Mounting brackets
2 Large
flat washers
2 Phillips-head
duct cover
Decorative
screws
duct covers
• To remove the shipping board, locate and remove
2 screws at the top of the assembly and 2 screws
inside the hood behind the filter guides on the left
and right sides. Discard the shipping board.
Junction box
Mounting screw
• Remove junction box cover.
• Remove knockout from junction box.
• Install strain relief onto junction box.
• Drill 1/8" Pilot Holes For Mounting Brackets.
5-7/8"
17-5/16"
C L
• Drill 1/8" Pilot Holes.
• Drill 1/8" Pilot Holes.
Align edge 25-1/2" above Cooking Surface.
Wall-mount template
2 Utensil rods with 4 machine screws
Additional Parts for Recirculation Operation
Air deflector with upper
duct connector
7
Knockout
Mounting screw
Shipping board
3 Stainless
steel grease
filters
3 charcoal filters

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Monogram zv755

Table des Matières