Télécharger Imprimer la page

Parts Provided; Plan The Installation; Remove The Packaging - GE UVC7300 Manuel Du Propriétaire Et Instructions D'installation

Publicité

Les langues disponibles

Les langues disponibles

TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED)
Pencil and tape measure
Level
Tin snips
Wire cutter/
stripper

PARTS PROVIDED

Locate the parts packed with the hood.
NOTE: The hardware bag may contain extra pieces
to accommodate a variety of installation methods
for various models.
Hardware Bag
A
Phillips Head
Philips Head
Wood Screws
Machine Screw
3/16" x 1-1/2"
1/8" X 3/8"
(QTY: 4)
D
Phillips Head
Wood Screws
1/8" X 3/8" (QTY: 4)
49-2000893 Rev. 0
Installation Preparation
Aluminized
duct tape
Step ladder
Flashlight
UL listed wire nuts
Hood
B
Damper
Assembly
(QTY: 16)
L
Phillips Head
Wood Screws
3/16" x 1"
(QTY: 8)
Needle-nose pliers
Safety glasses
Phillips and flat-blade
screwdrivers

PLAN THE INSTALLATION

CAUTION
properly exhaust air, be sure to duct the air
outside – Do not vent exhaust air into spaces
within walls or ceilings or into attics, crawl
spaces, or garages.
WARNING
PERSONAL INJURY HAZARD
It is recommended that 2 people are used to
install the range hood. Failure to properly
lift rangehood could result in damage to the
product or personal injury.
NOTE: This rangehood can be installed as either
ducted or recirculation. In a ducted application,
this rangehood can be vented through the wall
or ceiling. When installed for recirculation, the
rangehood vents back into the room.

REMOVE THE PACKAGING

CAUTION
sharp edges.
Remove the hardware bag, literature package
and other boxed parts.
Remove and properly discard the protective
plastic wrapping and other packaging materials.
Electric drill and
appropriate bits
8" ducting and
caps as needed
Strain relief for
Gloves
junction box
To reduce risk of fire and to
Wear gloves to protect against
11

Publicité

loading