Final Setup

1. After transducers are mounted scroll to [Install Complete].
2. Trigger <Right Arrow> sensor.
3. Trigger <Down Arrow> to select [Install].
4. Trigger <ENTER>.
5. Observe the Measured Vs window and verify a correct sound velocity measurement (if
6. If correct, trigger the <Down Arrow>.
7. The flowmeter is now ready to report flow.
FUS1010 IP65 NEMA 4X Quick Start
Operating Instructions, 12/2008, CQO:QSG002 Revision B
known).
Select "Install"
Commissioning
3.5 Transducer Installation
33