Final Setup - Siemens SITRANS F Serie Guide Rapide

Masquer les pouces Voir aussi pour SITRANS F Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.5.3

Final Setup

1. After transducers are mounted scroll to [Install Complete].
2. Trigger <Right Arrow> sensor.
3. Trigger <Down Arrow> to select [Install].
4. Trigger <ENTER>.
5. Observe the Measured Vs window and verify a correct sound velocity measurement (if
6. If correct, trigger the <Down Arrow>.
7. The flowmeter is now ready to report flow.
See also
Refer to I/O Connection tables for input/output wiring and flowmeter manual for data
spanning procedures.
SITRANS FUH1010 Quick Start Guide
Operating Instructions, 1/2009, CQO:QSG009 Rev A
known).
Select "Install"
Commissioning
3.5 Transducer Installation
31