Top Up Coolant Procedure; Coolant Change Procedure; Coolant Filter Change Procedure; Air Filter Element Change Procedure - Ingersoll Rand SSR UP5-4 Manuel D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPeRATIOn AnD MAInTenAnCe MAnUAL
wARnInG
Do not under any circumstances open any
drain valve or remove components from the
compressor without first ensuring that the
compressor is FULLY SHUT- DOwn, power
isolated and all air pressure relieved from the
system.

TOP UP COOLAnT PROCeDURe

1.
Slowly remove fill cap.
2.
Pour coolant into spout untill spout almost
overflows.
.
Replace and tighten oil fill cap.
.
Start unit for about 10 seconds (until coolant
drains out the bottom of the sight glass).
5.
Slowly remove fill cap.
.
Re–fill into spout until spout almost overflows.
.
Replace and tighten oil fill cap.
.
Run unit.
Coolant level is correct when a unit is showing
coolant in bottom half of sight glass when up
to operating temperature (ten minutes running
loaded).
A. Correct at operating temperature
B. Too much
C. OK
D. Too little
Repeat this procedure to get coolant to proper level
when up to operating temperature.
When the unit is shut down, coolant will usually fill
up sight glass. Do not adjust level based on level at
shutdown. Proper level is always set for a running unit at
operating temperature.
CAUTIOn
ensure that SSR ULTRA is used. Failure to do so
will void manufacturers warranty.
http://air.ingersollrand.com
nOTe

COOLAnT CHAnGe PROCeDURe

It is better to drain the coolant immediately after
the compressor has been operating as the liquid will
drain more easily and any contaminant will still be in
suspension.
1.
Stop the machine, electrically isolate and vent all
trapped pressure.
2.
Place a suitable container close to the drain valve.
.
Slowly remove fill cap.
.
Remove plug from drain valve.
5.
Open the drain valve and drain coolant into
container.
.
Close the drain valve.
.
Replace plug in drain valve.
.
Refill the machine following the "top up coolant"
procedure above. After initial fill, to purge any
airlocks, the machine should be run for a few
minutes cycling between load and no load,
before checking that the level is correct.
.
Replace and tighten oil fill cap.

COOLAnT FILTeR CHAnGe PROCeDURe

1.
Stop the machine, electrically isolate and vent all
trapped pressure.
2.
Loosen filter with the correct tool.
.
Remove the filter from the housing.
.
Place the old filter in a sealed bag and dispose of
in a safe way.
5.
Clean the mating face of the housing taking care
to avoid any particles entering the machine.
Remove the new Ingersoll Rand replacement
.
filter from its protective package.
.
Apply a small amount of lubricant to the filter
seal.
.
Screw the new filter down until the seal makes
contact with the housing, then hand tighten a
further half turn.
.
Start the compressor and check for leaks.

AIR FILTeR eLeMenT CHAnGe PROCeDURe

1.
Stop the machine, electrically isolate and vent all
trapped pressure.
2.
Unscrew the retaining cap and withdraw the old
element.
.
Fit the new element.
.
Replace the retaining cap.
MAInTenAnCe
1

Publicité

Table des Matières
loading

Table des Matières