Commissioning
3.2 Setting the Parameters
Table 3-2
Pipe Configuration Option List Definitions
Options
Fully Developed
1 Elbow
Dble Elbow+
Dble Elbow-
Valve
Expander
Reducer
Norm Entry
Header Inlet
Intrusions
Transducer Selection
The following is a typical transducer installation procedure for D1H High Precision transducers.
1. Press <Left Arrow> to return to Main Menu. At the Main Menu, press the <Down Arrow> to
2. Press the <Right Arrow> to [Transducer Model]. Press <Right Arrow> and scroll to [1011HP-
3. To select Transducer Size, press <Right Arrow> and select [D1H]. Press <ENT>.
4. IMPORTANT: Record Number Index and Spacing Method.
5. Transducers can now be mounted.
6. After transducers are mounted scroll to [Install Complete] and select [Install].
22
select [Pick/Install Xdcr].
T1]. Press <ENT>.
Select based on type.
Select based on size.
After transducer is mounted select [Install].
Definitions
Fully developed flow, as would be expected for very long
straight pipe runs or installation downstream of a flow
condition.
Single 90 degree Elbow upstream of transducer installation.
Double out-of-plane Elbows upstream of transducer
installation.
Double in-plane Elbows upstream of transducer installation.
Not available at this time.
Pipe expansion upstream of transducer installation.
Pipe reduction upstream of transducer installation.
Not available at this time.
Header or pipe manifold upstream of transducer installation.
Not available at this time.
FUE1010 IP40 (NEMA 1) Energy Portable
Compact Operating Instructions, 5/2009, A5E02384186-03