Opening The Charging Station; Assembly; Minimum Distances; Installing The Supply Cable - Mennekes AMTRON Start Instructions D'installation

Masquer les pouces Voir aussi pour AMTRON Start:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 86

5.3 Opening the charging station

Fig. 11: Opening the charging station
Caution
Damage to the device.
Damage to the device by improper handling.
Do not use the brass bolts for attaching the front panel as
transport support or handle.
When delivered, the front enclosure part is not attached
with screws. The screws
accessory bag.
Opening the charging station
1. Remove the screws
1
Make sure that the screws are not lost.
2. Remove the screws
3
the front panel
4
. Make sure that the screws are not
lost.
After the installation of the charging station, the
enclosure screws on the back of the charging station can
be reached only with a shortened Allen key. The supplied
Allen key can be used.
11
1
are stored in the enclosed
and the front enclosure part
for the front panel and fold down

5.4 Assembly

5.4.1 Minimum distances

Fig. 12: Minimum distances (mm)
Maintain the specified minimum distances for unrestricted
access during operation, maintenance and repair.

5.4.2 Installing the supply cable

On-wall installation of supply cable
If supply cable or cable duct comes from below, you have to
break out the pre-cut opening in the front enclosure part.
The charging station can be placed on an on-site
installed cable duct (H 30mm x W 45mm). Suitable
recesses can be found on the back of the rear enclosure
part.
 See also "Fig. 13: Wall mounting" on page 12.
Concealed installation of the supply cable
2
.
In a concealed installation of supply, data, and control lines,
their positions must be arranged in accordance with the
drilling jig.

Publicité

Table des Matières
loading

Table des Matières