Final Works - Lenze 9300 vector Instructions De Montage

Masquer les pouces Voir aussi pour 9300 vector:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.2.5

Final works

Fig. 5−5
1. Check the control cables (plugs and cables) for correct fit and possible damages. (H)
– If the plugs do not fit correctly, or the plugs or cables are damaged, commissioning
is prohibited. Contact the Lenze service.
Fig. 5−6
2. Close the housings using the covers 0 1. Fasten the covers with 4 screws each.
EDKVF9383 DE/EN/FR 4.0
Control cables in the master and slave
0
Fastening the covers to the master and slave
l
Electrical installation
Master and slave connection
Final works
1
5
9300vec163
9300vec164
85

Publicité

Table des Matières
loading

Table des Matières