Final works

6.1

Installation check

(
Stop!
Destruction of the digital outputs (X5/A1 … X5/A4).
The digital outputs are not protected against external voltage.
Possible consequences:
ƒ
Protective measures:
ƒ
After completing the installation, the following must be checked:
Wiring for completeness, short−circuit, and earth fault
ƒ
Supply of the internal fan (only 500 V types)
ƒ
– the bridge position depends on the mains voltage applied
Power connection:
ƒ
– Supply via terminals L1, L2 and L3 (direct mains connection)
Motor connection in correct phase relation (direction of rotation)
ƒ
Incremental encoder (direction of rotation), if any
ƒ
)
Note!
The installation check is followed by commissioning. Further information can
be obtained from the System Manual for the drive controller.
ƒ
ƒ
ƒ
EDKVF9383 DE/EN/FR 4.0
Applying an external voltage to X5/A1 … X5/A4 can damage the digital
outputs. The control card does not work correctly any longer.
Never apply an external voltage to the terminals X5/A1 … X5/A4.
Read the System Manual carefully before you switch on the controller!
Carry out the commissioning steps in accordance with the System Manual!
If you use the "safe standstill" function, check the function of the circuit!