OPERATION

Configuring the UPS for EBMs

Initiating the Battery Test

52
®
Eaton
9140 (9910-E82/E83) UPS Installation Guide for IBM
www.eaton.com/ibm
To ensure maximum battery runtime, configure the UPS for the correct
number of EBMs:
1.
Select MENU from the system status screen, then select SETUP,
USER SETUP, and BATTERY PACK.
2.
Use the
or
button to select the number of battery packs in
your UPS configuration:
All UPS and EBM Cabinets
UPS + 1 EBM
UPS + 2 EBMs
UPS + 3 EBMs
UPS + 4 EBMs
3.
Press the
button to save the setting.
4.
Press the
button until the system status screen appears.
NOTE The batteries must be fully charged and the UPS must not be in Battery mode to
perform the battery test.
NOTE For an accurate battery test, test the UPS with at least 10% load applied to the UPS.
You can configure the battery test settings, initiate a test, cancel a test,
and view the test report.
Configuring the Battery Test. The UPS automatically performs a battery
test approximately every 90 days if this option is enabled. To enable or
disable the automatic battery test, select MENU from the system status
screen, then select SETUP, USER SETUP, and BATTERY TEST. Select
to enable or disable the automatic test.
Number of Battery Packs
S
®
Applications
164201715 Rev 2
2
3
4
5