Installation and start-up of KEOR HPE UPS 60÷160 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷160 kVA
Installazione e avviamento KEOR HPE UPS 60÷160 kVA
2)
Install the batteries received in a separate packages and install it in accordance with the picture
16 and picture 17.
Picture 16- 12/14Ah 12V battery connection tray top view
Picture 17-12/14Ah 12V battery connection tray front view
3)
After the connection re-insert the battery trays on the internal of UPS.
4)
Put back and fix the left/right cover with the four screws.
OML46086 REV. I
41