Installation and start-up of KEOR HPE UPS 60÷160 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷160 kVA
Installazione e avviamento KEOR HPE UPS 60÷160 kVA
The UPS must be so installed as to ensure its serviceability and to allow a correct air flow as much
as possible.
With regard to the minimum distances from the walls, for all of the UPS sizes the same installation
conditions apply as indicated in the table below.
- UPS with internal batteries
Recommended clearances
Minimum clearances
- UPS with external battery cabinet
Recommended clearances
Minimum clearances
The table below shows the air volume required for an optimal ventilation and cooling of the UPS.
Power (kVA)
Air volume (m
A (mm)
50
0
A (mm)
50
0
60
3
/h)
1000
B (mm)
C (mm)
1200
600
1200
600
B (mm)
C (mm)
1200
400
1200
80
100
125
1200
1200
1500
OML46086 REV. I
D (mm)
600
400
D (mm)
600
0
400
160
1500
25